|
Location: gloucestershire
Joined: Sep 2005
Posts: 8,432
|
|
I give up!
So we had the boiler done begining of the month,they had to run a pipe outside and it had to go into the bathroom.
So all the boarding behind the toilet and sink was removed along with the bath panel and skirting board.
Whilst this was removed it was discovered we had a leak from somewhere,but the guys were not entirely sure where it was coming from.
Anyway this was reported by the woman in charge of maintainance along with the panels and skirting that needed replacing.
We had a letter a few days later stating an appontment had been made for today for the plumber to call,nothing about the woodwork that needed doing,so I rang them and was told it was all down to be done today.
Anyway cue today and the guy comes out to find the leak,still not sure where it's coming from and he knows nothing about the woodwork that needs doing
Anyway I ring the H/A, and the wood work hasn't been raised as a job
Whilst on the phone the guy tells me he thinks we have a cracked brick,hence the rain and wind are getting through causing the water and draft.
Woman on the phone tells me she will call back with an appointment for wood work.
I tell her again what the repair guy said about the cracked brick and it's no good just repairing the wood work without first doing the brick,her reply was that the repair guy needs to report it,then they will investigate
So now we have an appointment on the 9th of sept which will be a waste of time unless someone looks at this cracked brick in the meantime.
Why she couldn't take the report from me I don't know,I'm sure they just like been awkward!